Case Studies

Sheeplands WTW Filter Refurbishment

Thames Water’s Sheeplands WTW processes borehole water at an average of 7.5 MLD and a surge flow of up to 11.3 MLD, increasing to 14.7 MLD when additional IX vessels are added. This water contains up to 154 mg/l of nitrate. In 2002 TWUL asked […]

read more

Wastewater Service Case Study

Hampton Court Palace Ejector Replacement. All of the sewage at the Palace drains to one of three systems: Tennis Court Lane, the Round Kitchen and the Stone Garden.  Satec installed the original ejectors in these systems and we carried out a complete refurbishment, replacing the […]

read more

Beckton Case Study Picture

Beckton STW Odour Control Project Overview Beckton Sewage Treatment Works is the largest in Europe and is located in the borough of Newham, London. The works treats sewage from a population equivalent of 3.7 million within a catchment area of 300km2. The works have been […]

read more

Winterton Leachate Site, Winterton

Background During 2004, The Waste Recycle Group will install a leachate treatment facility with a specifically designed plant incorporating an Aerated Suspended Growth Plant (ASGP) with an additional dissolved air flotation (DAF) plant for assistance in the removal of residual suspended solids and colloidal material […]

read more

Sheeplands Water Treatment Works, UK

Background The Sheeplands WTW at Wargrave, Berkshire, operated by Thames Water Utilities Ltd, is supplied by 3 boreholes and originally comprised GAC filters and chlorine contact tank for final chlorination. Due to increasing nitrate levels in the borehole water, Satec was awarded the contract by […]

read more

Aluminium Bahrain

Background As part of the Aluminium Bahrain (ALBA) line 5 expansion, Satec supplied a desalination plant through Bechtel International to provide ALBA with an extra flowrate of 110 m3/hr of treated potable quality water from a borehole source having a TDS level of 14,500 mg/l […]

read more