Aluminium Bahrain (ALBA) Line 5 Expansion

As part of the Aluminium Bahrain (ALBA) line 5 expansion, Satec supplied a desalination plant through Bechtel International to provide ALBA with an extra flowrate of 110 m3/hr of treated potable quality water from a borehole source having a TDS level of 14,500 mg/l and hydrogen sulphide content of 6.5 mg/l.

background

Reverse Osmosis Desalination Plant

Project Overview

As part of the Aluminium Bahrain (ALBA) Line 5 Expansion, Satec Service Ltd designed, manufactured, and supplied a reverse osmosis (RO) desalination plant for Bechtel International. The system was developed to provide an additional 110 m³/hr of potable water from a challenging borehole source containing 14,500 mg/l Total Dissolved Solids (TDS) and 6.5 mg/l hydrogen sulphide.

The fully engineered treatment process converts high-salinity groundwater into potable-quality water suitable for industrial use, delivering a reliable and efficient water supply for one of the world’s largest aluminium production facilities.

Treatment Process

The borehole water is conditioned with sulphuric acid before entering a single-pass reverse osmosis system operating at a 75% recovery rate. Following desalination, hydrogen sulphide is removed through a degasser tower and a three-stage oxidation process using sodium hypochlorite and sodium bisulphite.

The treated water then passes through cartridge and activated carbon filtration before final re-hardening, pH correction, and chlorination, producing high-quality potable water that meets the project’s operational requirements.

Key Equipment Supplied

  • Reverse osmosis desalination plant (110 m³/hr)
  • High-pressure and interstage Flowserve pumps
  • GRP inlet and cartridge filtration systems
  • Forced-draught GRP degasser tower
  • Three-stage reaction tank
  • Activated carbon filtration system
  • Chemical dosing systems for sulphuric acid, antiscalant, hypochlorite, bisulphite, lime, and carbon dioxide
  • Clean-in-Place (CIP) and membrane flushing systems
  • Complete skid-mounted process equipment

Project Highlights

  • Designed and supplied for the ALBA Line 5 Expansion Project
  • Delivered through Bechtel International
  • Treated high-TDS groundwater (14,500 mg/l)
  • Produced 110 m³/hr of potable-quality water
  • 75% reverse osmosis recovery rate
  • Complete turnkey process solution with integrated chemical dosing and post-treatment systems

Satec Service Ltd has extensive experience delivering bespoke reverse osmosis, desalination, and advanced water treatment systems for major industrial and infrastructure projects throughout the UK and internationally.

Out of hours call out